| SPS |
|
|
|
Synchronized Production System is used to improve efficiency in a production line by means of 12 steps. Reducing waste is the core of SPS. When talking about waste you have tot hink of unnecessary work (waiting, searching, thinking, etc.), work procedures (walking from one point to the other, manual labor, working on machines, etc.), waste regarding machines (over dimensioning of machines, feedline that are too long, etc.) and much more. It uses 6S and SMED. When to use Synchronized Production System is used in the β-phase and the mass production phase. Synchronized Productie System is used:
Description The 12 steps at Synchronized Production System are:
For more information please read The Synchronized Production System by Hitoshi Takeda or mail to This e-mail address is being protected from spambots. You need JavaScript enabled to view it .
|





